|
TJ_EPBS_01 - Physical Architecture Realization |
|---|---|
| This rule checks the realization consistency between physical architecture and EPBS architecture. | |
|
TJ_EPBS_03 - Configuration Physical Artifacts Realization check |
|---|---|
| This rule checks that a Configuration Item realizes at least one Physical Artifact. | |
|
TJ_EPBS_04 - EPBS Architecture Realization |
|---|---|
| This rule ensures the realization consistency between EPBS Architecture and Physical Architecture. | |